
Drone Stockpile Survey Cost: What Quarries Pay in 2026
Planning ranges for one-off and recurring stockpile and quarry surveys, and the factors that move the price.
Planning ranges (estimates, not quotes)
As a rough guide, a single-site stockpile survey with a volume report commonly falls somewhere around $800–$3,000, depending on site size and pile count. A full quarry topographic survey with surfaces for mine planning often runs higher, roughly $2,000–$8,000. LiDAR highwall work and underground scanning are priced per project and can be well above these ranges. Always confirm with real quotes.
What moves the price
Site area and pile count, travel distance, accuracy required (survey-grade with ground control costs more), LiDAR versus photogrammetry, MSHA training and site induction time, contractor-platform requirements (ISNetworld, Avetta), turnaround and the outputs and software formats you need.
Recurring programmes
Monthly or quarterly programmes are usually cheaper per flight. Some operators also offer subscriptions that include a web viewer and trend reports across multiple sites.
Getting comparable quotes
Send every provider the same brief: service, site type, location, area or number of piles, accuracy needed, outputs, frequency and budget band. Our quote form captures these fields so you can compare line by line.
Ready to compare providers?
Describe your project once and get quotes from suitable mining drone operators.